Davies demolitiongrading lotgradedforms for concrete foundationplumbingdrainage for downspoutssill plates insallationnice for crawl spacefloor joist installedsubfloor installedstart of framingall walls sheeted with 5ply 1/2 inchframing stair risers2nd floor sub floor installedridge beams installedinstalling raftersroof sheeted and barges and facia installedprep for wainscotpapered with 30pd felt,(best protection)siding is hardi cement boardsprep for in floor heatconcrete poured over hot water pipesmechanical roomfireplace insert the hot water pipes for the in floor heatwe do all the cabinetry installationinstalling a Murphy bedfloor installationpantryfor petslaundry rmtrex decking
Neime north & west sidenorth & east sideeast sideeast sideesat side/start of demonew barge boardstarps keep yard nicenew faciaprep for new roofdemo patio for new deckremodeling the inside30pd felt for best protection against the elementsnew windows and trimnew corner boards side with cedar shakesnew front door
Heskett switched drain sides for tubframed walls to ceilingremoved this wallremoved pocket door for swing doorblocking for vanityhas in floor heating installed removed closet to hall for bigger showertile floorin floor heat for bath room under the tub we found rotwe had this ducting reroutedfrom the sun deckwe had the old plumbing replacedunder the shower the floor was rottenfrom the tub above
Bastiani demo-we found unused spacebuilt cabinet to fill voidwalls were far from plumbwe also paper before boardniche is installed to lay outthe red guard is great for added protection from waterthe shelves were made from the tile by our setter